 |
Layout all setup at the Alton Ltd,Medstead 12 Nov 09
|
|
 |
CM Oct 2009
|
|
 |
CM Oct 2009
|
|
 |
Long view of the sea with a UP train
peco publications
|
|
 |
UP passenger exits the right hand tunnel
peco publications
|
|
 |
A view of the cottage
peco publications
|
|
 |
Looking up from the ocean
peco publications
|
|
 |
2 freights meet at the siding
peco publications
|
|
 |
Long view of the layout
peco publications
|
|
 |
SP freight heads along the cliffs
peco publications
|
|
 |
looking back at the sidding with an SP freight exiting the tunnel
|
|
 |
looking back at the SP shed and Paco's
|
|
 |
SP freight passing the SP maintenance shed
|
|
 |
Low shot upt o the right hand tunnel
|
|
 |
Overall view of the left board,showing the Ocean at the front
|
|
 |
View of the Cliffs from the sea
|
|
 |
Bathers on the rocks at the bottom of the cliff side
|
|
 |
Scenery nearly there
|
|
 |
Left hand corner of layout scenery nearly done
|
|
 |
Some of the colour going on
With one of the 3 buildings (this ones not yet finished)that will be on the layout
|
|
 |
Another angle
|
|
 |
Scenery starting to come together on the right hand board
|
|
 |
All the plaster work done and backscene with 1 coat of blue paint
Long view of layout
|
|
 |
Looking back at the control end of the layout
|
|
 |
Looking at the tunnel end furthest from the control panel,the sea area has been sealed with pva
|
|
 |
Hills starting to come together and a little colour added
|
|
 |
Long shot looking back from the control panel end,with the backscene (laminate floor panel) in place
|
|
 |
The new rock formations (polystrene tiles) starting to take shape
|
|
 |
A triple headed SP freight pops out of the top tunnel
|
|
 |
Layout looking from the Control end with the viewing side on the right and storage on the left a backscene will be just in front of the storage loops
|
|